Drop in the tender.Start estimating.

BidMate does the busy work in between.

It reads the tender package, builds your bid items, reviews the drawings, specifications, environmental reports and addenda, and brings the important information to you.

Then it can build your pricing using your crews, your production rates, your equipment and your material costs.

Upload your tender package
BidMate builds the bid
Price it with your company data
Main Street Reconstruction
Tender 26-104 · Closes Aug 28, 2026
Schedule of Prices
Bid items built from your tender package.
Items
142
Priced
118
Open
24
Total $
$8.64M
#DescriptionQTYUnitBid Unit $ExtensionLabourEquipmentMaterialSubTruckDoneAll
1.1
Performance & Labour Bonding
General
1LS$42,500.00$42,500.00
Labour$0.00
Equip$0.00
Mat$0.00
Sub$42,500.00
Truck$0.00
2.01
Remove Existing Sidewalk
Site Works
420m²$18.40$7,728.00
Labour$8.10
Equip$6.20
Mat$2.10
Sub$0.00
Truck$2.00
3.02
Concrete Sidewalk, 150mm
Concrete
420m²$112.75$47,355.00
Labour$48.75
Equip$32.10
Mat$22.30
Sub$9.60
Truck$0.00
3.03
Curb & Gutter, OPSD 600.040
Concrete
315m$68.90$21,703.50
Labour$28.40
Equip$18.50
Mat$22.00
Sub$0.00
Truck$0.00
4.01
300mm PVC Watermain
Watermain
685m$486.20$333,047.00
Labour$142.00
Equip$186.00
Mat$118.20
Sub$0.00
Truck$40.00

How it works

From tender package to working estimate.

1

Upload the tender package

Drop in the complete tender package — drawings, specifications, bid forms, addenda, environmental reports and more.

2

BidMate builds the estimate

BidMate reviews the documents, identifies the scope, creates the bid items and organizes the information you need to start estimating.

3

Price it with your company data

Let BidMate build unit rates using your crews, production rates, equipment, materials, trucking and subcontractor costs. Or enter and adjust pricing yourself.

4

Review. Refine. Bid.

Work through your estimate, make your final adjustments, review your numbers and get the tender ready to submit.

Upload tender package

Drag and drop files hereor browse

Plans, specs, addenda, reports, PDF, CAD, Excel, images and more.

Bid ItemsTakeoffsDocuments
Bid Items (142)
  • 1General Requirements
  • 2Site Preparation
  • 3Concrete
  • 4Underground Works
  • 5Surface Works
  • 6Miscellaneous
Unit Price Breakdown
Labour
$48.75
Equipment
$32.10
Materials
$22.30
Subcontractor
$9.60
Unit Price
$112.75
Bid Summary
Estimate Total
$8,642,750
Contingency
$432,140
Bid Total
$9,074,890
Export / Submit

Meet Biddy.She already read the tender.

Biddy is your estimating assistant inside BidMate. Ask questions about the drawings, specifications, addenda, environmental reports and more — without leaving your estimate.

  • Reads all tender documents
  • Finds answers fast
  • Provides source references
  • Helps you keep estimating
Biddy
Your estimating assistant
— ×
What concrete mix is required for the sidewalk?
The sidewalk requires 32 MPa concrete with 5–8% air entrainment. See Specification 32 13 13, Section 2.3.
Source: 32 13 13 Concrete Sidewalks, 2.3
Are there any contaminated soils?
What are the permitted working hours?
What testing is required for the watermain?
Ask Biddy a question…

Ask Biddy. Get the answer. Keep estimating.

Trusted by civil contractors who bid to win.

Ready to build yournext winning bid?

Upload your next tender and see what BidMate can do.

Ask Biddy1